Got up super early today again and torqued in TT to bellhousing bolts and flex plate to flywheel. Suspended the transmission using "2" 500 lbs straps and removed the jack in preparation for the next phase-rear suspension installation. Presented the crossmember on position and raised it a bit. Placed 3M Strip-Calk on top of the shock tower plates, just like described by Dwayne. Next I'll work on the brakes....can't wait!
No comments:
Post a Comment